Scaffolding Services For Hanging SlikLine BOP @ Well Facility

  • Home
  • Case Study
  • Scaffolding Services For Hanging SlikLine BOP @ Well Facility
Install & Dismantle Scaffolding

Background

Our client problems is how to hanging Gin Pole Using Scaffolding in Offshore Facilities. This scaffolding is should able to carry the following criteria :

  • The Structural Height Is About 18 meters
  • The Material to be lifted and hanging around 2 Ton consist of Shackle, Turn Around Sheave, Toolcatcjer, Riser, QTS, Tool Trap and BOP

Our Solution

Scaffolding Design

To Perform the job is executed well and safety, we prepare the scaffolding design

  1. We analize Hazard Identification Risk Assesment & Job Safety Analysis
  2. Conceptual design
  3. Calculate & evaluation Load; strength of structure, contact for scaffolding design services at 081213178400

Trial

To test our design, we build and evaluated our design by trial in nearly same situation. The Concern of this model is to execute in the offshore, convined space and very risk load/duty.

Evaluation & Re-Trial

After first trial, together with our client we perform deeply discussion how to improve and solve some problems and mitigate the risk that occur in the field.

Project Execution

Man Power Preparation

Because its very critical job and high risk we reqruit qualified personil that have wide experienced in offshore and scaffolding job. In order to the budget, and situation limitation we prepare for 1 Experience Rigging & Scaffolding Supervisor, 4 qualified Scaffolder.

We’re conduct t-BOSIET Tropical Basic Offshore Safety Induction and Emergency Training.

Scaffolding Material; Tools Preparation

To perform this job we have to deliver quality and inspected scaffolding material standar BS1139 thickness 4 mm and already pass inspection controll.

Another risk equipment that have to mobilize to the site is hanging beam with pad eyes. This hanging beam is next will be support by scaffolding and lifted the main material. in order to make sure that there’s no failure in hanging beam we invite thrid party to ferform welding by certifed welding and perform also NDT Test for the welding.

Safety Management

The job is mainly risk because its located in offshore, convinent space and also the job is to perforated well that using explode material. So we’re very careful to handle its by seriously to conduct HIRA for overall project planning & executing and the Job Safety Analysis when the job is perform in the field.

JSA Page 1
JSA Page 2
JSA Page3
JSA Page 4
JSA Page 5
JSA Page 6
JSA Page 7

Alhamdulillah, Some Of The Documentation Of Succesfull Job

The Scaffolder is Fully With Safety PPE and Scaffolding belt to carry on Tools
Thanks For The Team ; Qualified Team ; Profesional and Honest
BOP already lifted and hang on the scaffolding structure
Proyek ini meliputi perancangan, perhitungan dan trial, dan pemasangan scaffolding untuk Pembongkaran BOP seberat 2 Ton
Scaffolding Belt is made the Job easier.
Team Work is the key job completed safety and as requested
In The Top
Tool Box Meeting as main part of very essential in safety management

Leave A Comment

Your email address will not be published. Required fields are marked *